Cooling Load Calculations

Engineering Enquiry Data Sheet For Cooling Load Calculations

This information is used to calculate the amount of heat being added or removed from a room or product in a given time period.
When filling out the information remember that our equipment selections will be based on your information and on our knowledge of what is normal for this industry.
Be realistic about the amounts of product being processed, and the temperatures that product both enters the process and must achieve .
Be especially mindful of the time required to carry out the heat transfer.
Twice as fast cost twice as much to install and will cost more in power !
If you cannot answer every question answer the ones you can and will use our experience to fill in the gaps .

Customer Information

Customer name (company)…………………… ………………………………………………….
Site contact…………………………………………………………………………………………
Phone number ………………………………………Email address…………………………………
Street address ………………………………………………………………………………………..
Site location (City )…………………………………………………………………………………

Room temperature required…………………………
what is the room used for…………………………………………………………………………....

Room size

Length (in meters) ……………………..width …………………..… Height ……………………….
Room panel thickness……………………….
Type of panel (sandwich with foam )……………………… is the panel fire retardant (PIR) Y / N
If the room is not a square or rectangle please provide a sketch.

Is the room built next to other rooms that are either hotter or colder than the outside air temp Y/ N
If yes please provide a sketch showing the adjoining room temperatures.

Type of roof above room ( i.e. sheet metal with 2m high ceiling )………………………………….

Type of Product in Room

amount of product per 24 hours……………………………………………………………

How is product delivered to and from room ? (ie container 3 x loads 20 tons each , or small batches of 200 kg every two days)
…………………………………………………………………………………………………………
…………………………………………………………………………………………………………

Is product sealed in packaging………………………………………………………………………
Entering temperature ………………………….. leaving temperature………………………………
Time required to achieve temperature……………………………………………………………….

Doors

Please not the doors that the room requires.
i.e. personnel door …………. , fork lift door …………… glass self serve doors …………………
Do the doors have air curtains or rapid roller doors. …………………………………………………
Does the room have an anti room…………………….If yes what temperature………………………

Room lighting does the room need any special lighting.....................................................................

How many people will be in the room…………………………forklift trucks ………………………

Is there any machinery in the room that produces heat ? …………………………………………….
If yes give details ………………………………………………………………………………………………………..

Floor Heating

If the room is a freezer the floor will need to be heated. Is there an existing slab floor…Y / N……

Any special requirements. ?
……………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………………
Do you have a preference for the refrigerant used in the system ? R134a, R404a, Carbon dioxide (R744) Ammonia (R717 ) ?................................................................................................................

Are you interested in power reduction if it increases to initial installation costs …Y/ N…………..

The more information you can provide the better our engineering will match your needs. If you have any additional information please send it along with this sheet to the address above, or Email it to ianw@strathbrook.com.au or mickn@strathbrook.com.au